亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

 

Three Gorges Project to be completed in 5 years

0 CommentsPrint E-mail Xinhua, February 25, 2011
Adjust font size:

All construction works on the Three Gorges Project will have been completed by 2015, said a spokesman with the developer, China Three Gorges Corporation (CTGC), Friday.

An underground power station with six hydropower turbo-generators being cut beneath the mountain on the southern bank of the Yangtze River and a lift for vessels on the river's northern bank are the remaining parts to be constructed, said the spokesman.

The multi-functional water control system, believed to be the world's largest, began construction 18 years ago. Its main works include a gigantic dam, a five-tier ship lock. In addition to hydropower generation, the project is also capable of flood control and navigation.

The Three Gorges Project has had 26 hydropower turbo-generators in operation. By its completion, the project is capable of generating 100 billion kwh electricity a year, the spokesman said.

By the end of 2010, the project had generated more than 440 billion kwh of electricity since it started to generate power in 2003.

Print E-mail Bookmark and Share

Go to Forum >>0 Comments

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码