亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies


Eight Projects at Three Gorges to Start in 2002
Eight new projects will be launched this year at the Three Gorges area, according to a recent news release on the invitation of bids held in Wuhan, capital of central China?s Hubei Province.

The eight projects are as follows:

  • Filling the three-stage isolating dam at the upper reach of the Yangtze River. The designed fill volume is 7 million cubic meters (9.16 million cubic yards). The Three Gorges Project Development Corporation plans to finish the bid invitation by June and start construction in July.

  • Construction and installation of a floating navigation dam and floating wharf. The floating navigation dam will be 120 meters (131 yards) long, 10 meters (10.9 yards) wide and 3.5 meters (3.8 yards) high, while the floating wharf will be 90 meters (98.4 yards) long, 13 meters (14.2 yards) wide and 3.6 meters (3.9 yards) high.

  • Trial run of a permanent ship lock in water. From April to June, the purchasing and installation of water supply and drainage system and pump plant system should be finished.

  • Bridge crossing the tailwater channel of underground hydropower station as part of the right bank road leading to the construction site. The bridge will be 135 meters (147.6 yards) long and can bear a load of 600 tons. The project will be started in the third quarter of the year. Now the work plan is being studied.

  • Dam of open diversion canal and cofferdam of earth and stone. The bid for it is in April and the project will be started by June.

  • Cofferdam of the third-stage concrete rolling over. The bid is in April and the project will be started by the end of the year.

  • Third-stage construction of the principal part of the Three Gorges Project. The bidding papers have been distributed and the construction will be started by the end of the year.

  • Purchasing and installation of auxiliary electromechanical equipment in the left bank power station at the second stage. This includes telecommunication system, high- and low-voltage air compression system, oil pump and smoke filter of the oil system, heating and ventilation system and firefighting system.

    Year 2002 is critical to the 3-year storm fortifications of the Three Gorges Project. In this year, an investment of 20.216 billion yuan (US$2.45 billion) will be put into the pivots, transmission and submission project and resettling of residents in this area, the largest sum since the Three Gorges Project was launched 10 years ago.

    The Three Gorges Project plans to invite 79 bids this year, involving 5.28 billion yuan (US$638.7 million). Of them, 24 bids exceed 30 million yuan (US$3.63 million) each, which are mainly the resettlement of residents and purchasing of equipment and commodities. Twelve projects will be open for bids, with a total estimated bidding sum of 4.77 billion yuan (US$577 million), while the other 12 for invitation bids, involving 370 million yuan (US$44.76 million).

    If categorized according to characteristics of each bid, 40 are in construction and installation, 30 are in purchasing of electromechanical equipment, five are commodity purchasing and four are in other kinds.

    (新华社 [Xinhua News Agency], translated by Li Jinhui for China.org.cn, April 24, 2002)


  • Massive Resettlement out of Three Gorges Basically Ends
    Environment Well Protected at Three Gorges Dam Area
    Premier Zhu on Three Gorges Project Construction Quality
    Three Gorges Project to Be Dammed in 2002
    Misappropriated Money Retrieved
    Dam Harmless to Yangtze's Ecosystems
    Print This Page
    |
    Email This Page
    About Us SiteMap Feedback
    Copyright © China Internet Information Center. All Rights Reserved
    E-mail: webmaster@china.org.cn Tel: 86-10-68326688
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码