亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies


Shandong, Jilin Look to Nuclear Power

Authorities in Shandong Province have confirmed that they will proceed with three new nuclear power plants, whilst Jilin Province is considering building their first. All four are expected to be in operation by 2010.

The three projects in the eastern province of Shandong are Haiyang Nuclear Power Station in Yantai City, and Rushan and Rongcheng stations in Weihai City, sources with the local Development and Reform Commission said yesterday.

The designs for all three are quite similar, with an annual capacity of 4 to 6 million kilowatts. An investment of 40-80 billion yuan (US$4.8-9.6 billion) will be needed for each.

The National Development and Reform Commission and the Ministry of Science and Technology have approved preliminary feasibility reports for the Haiyang and Rushan plants, but all three projects are awaiting final approval from the central government.

Shandong has a total demand of 30 million kilowatts a year but can currently provide only half of the 70 million tons of coal needed to produce it, with the rest being brought in from other provinces. It is estimated that annual demand will reach 50 million kilowatts in 2010.

In the northeastern province of Jilin, local media reported China Electric Power Investment Corporation as saying that it plans to invest 40 billion yuan (US$4.8 billion) in a 4 million kilowatt nuclear power station near Baishan City.

"Up to now, the company has invested over 10 million yuan (US$1.2 million) in preliminary construction," a senior official from the city's Development and Reform Commission was quoted as saying by the Shenyang-based East Asia Economy and Trade News.

Jingyu County has been selected as the site for the plant because of its geological features and rich water resources.

The newspaper said the project would be the largest in the history of the province, but the construction schedule has not yet been revealed.

Jilin has a demand of 12 million kilowatts per year at present, and supply lags far behind.

(China Daily February 24, 2005)

Nation to Launch New Nuclear Power Corp.
Vice-Premier Urges to Accelerate Nuclear Power Construction
Nuclear Power Generation Capacity to Triple
China Accelerates Nuclear Energy Development
China Invites Bidding on Nuclear Power Plants
Nuclear Power to Fuel Growth
China Institute of Atomic Energy
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码