亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar


Hot Links
China Development Gateway
Chinese Embassies

Tunnels Under Yellow River for Water Diversion Project

Construction of two tunnels beneath the Yellow River, the country's second longest, middle route of the giant south-north water diversion project, will start in August, according to the information from the department in charge of the tunnel.

The entire project of two tunnels, with a designed length of 19.3 km, including two 3.5-km-long tunnels, will be situated 30 km upstream the Yellow River Bridge at Zhengzhou, capital of Henan Province.

The tunnels will have a designed water flow capacity of 265 cu m per second each, or a maximum flow capacity of 320 cu m per second each. It will cost 3.1 billion yuan (US$382 million) and will take 51 months to complete.

The entire tunnel project requires a land requisition of 684 hectares and relocation of 386 residents. Up to now, the preparatory work, including construction of infrastructure at the construction site, and land requisition is moving swiftly.

The tunnels are two of the key works to be finished for the middle route of the south-to-north water diversion project, designed to carry water from the Yangtze River, China's longest, in the country's water-rich southern areas to its arid north.

The south-north water diversion project was first imagined by former Chinese leader Mao Zedong in 1952. After protracted debates that lasted nearly a half century, the State Council sanctioned the ambitious project in December 2002.

It plans to divert 44.8 billion cubic meters of water annually from the Yangtze, China's longest river, through eastern, middle and western routes to relieve water shortages in north China by 2050.

The construction of the project's eastern route began in December 2002 and is expected to supply water to Shandong Province by 2007. The central route began in December 2003 and is due to supply water to Henan and Hebei provinces, Beijing and Tianjin by 2010. The western route is scheduled to begin construction in 2010. The massive water diversion project will cost 500 billion yuan (US$61.65 billion).

(Xinhua News Agency August 1, 2005)

Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码