亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

Home / Environment / News Tools: Save | Print | E-mail | Most Read
Construction of New Hydropower Plant on Yalong River Begins
Adjust font size:

China started construction of another major hydropower station, designed to have an installed capacity of 4.8 million kilowatts, in the southwestern province of Sichuan on Tuesday, according to local sources.

 

Known as the second-tier hydropower plant at Jinping, a bend in the Yalong River, the project involves a total investment of 29.8 billion yuan (about US$3.73 billion). It is scheduled to be completed in 105 months.

 

The developer, the State Development and Investment Corporation, said the new plant is the largest of a series of hydropower plants to be constructed on the 1,571-km-long Yalong River.

 

Construction of Ertan hydropower station, located at the lower reaches of the Yalong River and with an installed capacity of 3.3 million kw, has been completed.

 

Construction of the first-tier hydropower plant at Jinpin, with a designed installed capacity of 3.6 million kw, began in November last year. It is expected to be completed in 2014.

 

(Xinhua News Agency January 31, 2007)

Tools: Save | Print | E-mail | Most Read

Related Stories
China to Build New Hydropower Plant on Yangtze River
SiteMap | About Us | RSS | Newsletter | Feedback
SEARCH THIS SITE
Copyright ? China.org.cn. All Rights Reserved ????E-mail: webmaster@china.org.cn Tel: 86-10-88828000 京ICP證 040089號(hào)
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码