亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
LIFE
PEOPLE
TRAVEL
THIS WEEK
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates


Hot Links
China Development Gateway
Chinese Embassies

Safety Casing Test Ended at Qinshan Nuclear Power Station
Qinshan Nuclear Power Station is the heavy-water reactor nuclear power station, the first of its kind dedicated to commercial use in China. The test of the safety casing for No.2 generating unit, the 3rd phase of Qinshan Project was brought to an end on Jan. 28, 2003.

The leakage indicates only 0.132 percent reactor volume/day, which is 26.4 percent of the acceptance standard. Though the period for testing was only 8 days the test has come up to the acceptance requirement.

The test has created two world records in the safety casing for nuclear power stations of the same type, the lowest in leakage and the shortest in testing period. This marks that the engineering quality of smooth cylindrical casing for nuclear power station and its management in China has come to the forefront of the world.

The report pointed out that among the same type of nuclear power stations in the world the lowest leakage record was scored by No.1 generating unit of Qinshan Nuclear Power Station, registering the world record of 0.210 percent of reactor volume/day.

The safety-casing test is the biggest single item test for the nuclear power station in the regulating and testing period. It has things to do with many units and is faced with complicated preparations beforehand, which would affect many systems with greater unanticipated risks.

The test was conducted jointly by Qinshan No.3 Nuclear Power Co. Ltd. and the Canadian Atomic Energy Co., Ltd. The test was aiming at proving that the encapsulation of the reactor workshop can meet with the designed requirement supposing the accident is going to happen under the designed basic conditions. The acceptance standard of the test is that under the designed standard pressure of 124 kilo-pa the leakage won't exceed 0.5 percent of the reactor volume/day.

(People?s Daily January 31, 2003)

China's 1st Heavy Water Generator Starts Working
Qinshan III-Stage Heavy Water Nuclear Reactor Trial Run Successful
PICC Insures Nuclear Power Station
Nuclear Plant Achieves Milestone
China-built Nuclear Plant Runs at Full capacity
China to Develop Its Nuclear Sector
China's First Nuclear Plant Begins to Issue Regular Environmental Monitoring Results
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码