亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线

Home / International / State Exchanges Tools: Save | Print | E-mail | Most Read | Comment
China-bound branch pipeline may break ground next year
Adjust font size:

The paving of a China-bound branch line of the Eastern Siberia-Pacific oil pipeline may start at the end of the first quarter next year, Nikolai Tokarev, president of Russia's state-run pipeline company Transneft said in a TV interview on Thursday.

The designing work of the pipeline has been completed after the coordination between Transneft and the China National Petroleum Corp, and the construction project has been presented to related department in Russia for appraisal, said Tokarev, adding that the result is expected soon.

According to last year's cost evaluation, the budget of the project was about 600 million US dollars, he said.

The construction is expected to encounter a series of technical difficulties, including the paving of the pipeline going through the bottom of the Amur (Heilong Jiang) River, but the current technologies can ensure the smooth running of the project, he said.

Transneft wishes to start work as soon as possible, as the pipeline is expected to run synchronously with the 960-km line part in China, which starts from Daqing, China.

The 4,000 km-long Eastern Siberia-Pacific oil pipeline plans to link the Siberian city of Taishet near Lake Baikal and Russia's Pacific region via Skovorodino, the midpoint of the entire route. The first phase of the project, the 2,690-km route goes from Taishet to Skovorodino is expected to have an annual transport capacity of 30 million tons of oil.

The China-bound branch line will run from the midpoint of Skovorodino to the Chinese border under the latest deal between China and Russia. Its document was signed by Transneft and the China National Petroleum Corp during a meeting between Russian Prime Minister Vladimir Putin and his visiting Chinese counterpart Wen Jiabao on Tuesday.

Construction of the first phase of the pipeline was originally planned to start between October to December this year but was later postponed till the end of next year. But Putin in August ordered the speeding up of the construction.

(Xinhua News Agency October 31, 2008)

Tools: Save | Print | E-mail | Most Read
Comment
Pet Name
Anonymous
China Archives
Related >>
- Russia-China-India Oil Pipeline Discussed
- Work on Russia-China Oil Pipeline to Begin Soon
- Study Under Way on Russia-China Pipeline
Most Viewed >>
- Wen's visits to Russia, Kazakhstan 'fruitful'
- Serial blasts in northeast India kill 61
- Ninth kidnapped Chinese in Sudan killed
- Chinese student died after sexually assaulted by intruder in Sydney
- Missile attack kills 20 in Pakistan
> Korean Nuclear Talks
> Reconstruction of Iraq
> Middle East Peace Process
> Iran Nuclear Issue
> 6th SCO Summit Meeting
Links
- China Development Gateway
- Foreign Ministry
- Network of East Asian Think-Tanks
- China-EU Association
- China-Africa Business Council
- China Foreign Affairs University
- University of International Relations
- Institute of World Economics & Politics
- Institute of Russian, East European & Central Asian Studies
- Institute of West Asian & African Studies
- Institute of Latin American Studies
- Institute of Asia-Pacific Studies
- Institute of Japanese Studies
    1. <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>
      <thead id="556nl"></thead>

      1. <em id="556nl"><tt id="556nl"></tt></em>
        <ul id="556nl"><kbd id="556nl"><form id="556nl"></form></kbd></ul>

        <ul id="556nl"><small id="556nl"></small></ul>
        1. <thead id="556nl"></thead>

          亚洲人成网站18禁止中文字幕,国产毛片视频在线看,韩国18禁无码免费网站,国产一级无码视频,偷拍精品视频一区二区三区,国产亚洲成年网址在线观看,国产一区av在线 人妻无码久久影视 日韩久久久久久久久久久久 精品国产香蕉伊思人在线 无码国产手机在线a√片无灬 91在线视频无码